ForgeAsset / Utilities / Commonwealth Edison (ComEd)

Commonwealth Edison (ComEd) Watt-Hour EV class — EV fast-charging electricity cost

ComEd Watt-Hour EV class is the filed rate schedule ForgeAsset models for DC fast-charging sites in Commonwealth Edison territory in Illinois. Energy prices at 14.1¢/kWh flat; the demand side bills none (energy-only). For one reference Supercharger site held constant across the whole library, that works out to 15.8¢/kWh per dispensed kWh — rank 5 of 86 filed tariffs (1 = least expensive).

Model a site in Illinois

Modeled rates

Peak energy14.1¢/kWh
Off-peak energy14.1¢/kWh
Super-off-peak energy14.1¢/kWh
Demandnone (energy-only)
Rates effective2026-06-01

ComEd's Watt-Hour delivery class, elected by separately metered EV charging sites of any size and guaranteed through at least September 2033: per-kWh delivery with no demand charge. The bundled rate folds delivery, riders, the Illinois electricity excise tax, and a supply component set to ComEd's published Price to Compare — a market benchmark standing in for a competitive fixed supply contract, which large accounts purchase from a retail supplier. The supply benchmark resets each June and October.

Source: Commonwealth Edison (ComEd) filed rate schedule. Rates are digit-verified against the utility's own filed sheets and update within two weeks of any revision; derivations are on the methodology page.

What the reference site pays here

Blended energy
14.1¢/kWh
Demand / month
$0
Bill / month
$9,025
Effective ¢/kWh
15.8¢/kWh

Reference site: 8 Tesla V4 stalls at 235 kWh/stall/day (57,183 kWh dispensed per month), a 150kW per-stall demand assumption, the model's default time-of-use mix, and a 12% loss gross-up — identical to the full utility ranking, where this tariff sits at position 5 of 86.

The rest of the Illinois picture

The tariff is one layer. State taxes, incentives, clean-fuels programs, and the charging market shape the remainder — Tesla Supercharger ROI in Illinois covers them, and the US Supercharger Economics Map shows every US Supercharger over utility territories colored by this same effective-cost derivation.

Commonwealth Edison (ComEd) Watt-Hour EV class — questions

What does Commonwealth Edison (ComEd) charge for energy on Watt-Hour EV class?
The modeled rates are 14.1¢/kWh flat. At the model's default time-of-use mix (30% peak, 45% off-peak, 25% super-off-peak) that blends to 14.1¢/kWh.
Does Watt-Hour EV class carry a demand charge?
No separable demand charge is billed under the modeled structure — the cost sits in the energy rates instead.
What does electricity cost per kWh dispensed on this tariff?
For the reference site — 8 Tesla V4 stalls dispensing 235 kWh per stall per day, with a 12% loss gross-up — the all-in utility cost works out to 15.8¢/kWh per dispensed kWh, rank 5 of 86 tariffs in the library (1 = least expensive).

Model a Tesla V4 Supercharger site on Commonwealth Edison (ComEd) Watt-Hour EV class — payback, NPV, IRR, and a 15-year cash flow from your own inputs.

Run a scenario on this tariff

All 86 modeled tariffs are on the utilities index.

ForgeAsset is software, not investment, tax, or legal advice — outputs are model estimates from your inputs, not guarantees. Rates current as of research; verify current terms with the utility's filed schedule before committing capital.