ForgeAsset / Utilities / Entergy Mississippi

Entergy Mississippi C-29 — EV fast-charging electricity cost

Entergy Mississippi C-29 is the filed rate schedule ForgeAsset models for DC fast-charging sites in Entergy Mississippi territory in Mississippi. Energy prices at 10.8¢/kWh flat; the demand side bills $6.47/kW of monthly peak. For one reference Supercharger site held constant across the whole library, that works out to 25.7¢/kWh per dispensed kWh — rank 24 of 86 filed tariffs (1 = least expensive).

Model a site in Mississippi

Modeled rates

Peak energy10.8¢/kWh
Off-peak energy10.8¢/kWh
Super-off-peak energy10.8¢/kWh
Demand$6.47/kW of monthly peak
Rates effective2026-07-01

Entergy Mississippi's general service schedule for the Jackson metro and Southaven: flat energy with a moderate demand charge billed on a day-hours window, where the schedule's demand blocks resolve exactly at the modeled peak and the 80% ratchet stays inert at a constant modeled load. Figures fold the full rider stack — including the Grand Gulf capacity rider, the largest single mover, which resets each October — and Mississippi's 7% sales tax. The formula rate plan adjusts each July.

Source: Entergy Mississippi filed rate schedule. Rates are digit-verified against the utility's own filed sheets and update within two weeks of any revision; derivations are on the methodology page.

What the reference site pays here

Blended energy
10.8¢/kWh
Demand / month
$7,763
Bill / month
$14,674
Effective ¢/kWh
25.7¢/kWh

Reference site: 8 Tesla V4 stalls at 235 kWh/stall/day (57,183 kWh dispensed per month), a 150kW per-stall demand assumption, the model's default time-of-use mix, and a 12% loss gross-up — identical to the full utility ranking, where this tariff sits at position 24 of 86.

The rest of the Mississippi picture

The tariff is one layer. State taxes, incentives, clean-fuels programs, and the charging market shape the remainder — Tesla Supercharger ROI in Mississippi covers them, and the US Supercharger Economics Map shows every US Supercharger over utility territories colored by this same effective-cost derivation.

Entergy Mississippi C-29 — questions

What does Entergy Mississippi charge for energy on C-29?
The modeled rates are 10.8¢/kWh flat. At the model's default time-of-use mix (30% peak, 45% off-peak, 25% super-off-peak) that blends to 10.8¢/kWh.
Does C-29 carry a demand charge?
Yes: $6.47/kW of monthly peak. For a reference 8-stall site at 150 kW per stall that comes to about $7,763 per month.
What does electricity cost per kWh dispensed on this tariff?
For the reference site — 8 Tesla V4 stalls dispensing 235 kWh per stall per day, with a 12% loss gross-up — the all-in utility cost works out to 25.7¢/kWh per dispensed kWh, rank 24 of 86 tariffs in the library (1 = least expensive).

Model a Tesla V4 Supercharger site on Entergy Mississippi C-29 — payback, NPV, IRR, and a 15-year cash flow from your own inputs.

Run a scenario on this tariff

Other Mississippi utilities modeled: Mississippi Power.

All 86 modeled tariffs are on the utilities index.

ForgeAsset is software, not investment, tax, or legal advice — outputs are model estimates from your inputs, not guarantees. Rates current as of research; verify current terms with the utility's filed schedule before committing capital.