Entergy New Orleans LE-25 — EV fast-charging electricity cost

Entergy New Orleans LE-25 is the filed rate schedule ForgeAsset models for DC fast-charging sites in Entergy New Orleans territory in Louisiana. Energy prices at 7.0¢/kWh flat; the demand side bills $14.54/kW of monthly peak. For one reference Supercharger site held constant across the whole library, that works out to 38.3¢/kWh per dispensed kWh — rank 46 of 86 filed tariffs (1 = least expensive).

Model a site in Louisiana

Modeled rates

Peak energy7.0¢/kWh
Off-peak energy7.0¢/kWh
Super-off-peak energy7.0¢/kWh
Demand$14.54/kW of monthly peak
Rates effective2026-01-02

Entergy New Orleans' large-service rate for Orleans Parish: cheap block energy against a demand charge that carries most of the bill, with a rider stack that adds about 30% to base revenue — the storm-reserve rider alone adds a quarter, effective January 2026. Figures fold the trailing-twelve-month fuel factor, the franchise-fee divisor, and Louisiana's 2% business-utilities tax. The utility's separate EV demand-charge-relief rider is a five-year capped pilot the model excludes; taking it could only lower the modeled bill.

Source: Entergy New Orleans filed rate schedule. Rates are digit-verified against the utility's own filed sheets and update within two weeks of any revision; derivations are on the methodology page.

What the reference site pays here

Blended energy
7.0¢/kWh
Demand / month
$17,447
Bill / month
$21,911
Effective ¢/kWh
38.3¢/kWh

Reference site: 8 Tesla V4 stalls at 235 kWh/stall/day (57,183 kWh dispensed per month), a 150kW per-stall demand assumption, the model's default time-of-use mix, and a 12% loss gross-up — identical to the full utility ranking, where this tariff sits at position 46 of 86.

The rest of the Louisiana picture

The tariff is one layer. State taxes, incentives, clean-fuels programs, and the charging market shape the remainder — Tesla Supercharger ROI in Louisiana covers them, and the US Supercharger Economics Map shows every US Supercharger over utility territories colored by this same effective-cost derivation.

Entergy New Orleans LE-25 — questions

What does Entergy New Orleans charge for energy on LE-25?
The modeled rates are 7.0¢/kWh flat. At the model's default time-of-use mix (30% peak, 45% off-peak, 25% super-off-peak) that blends to 7.0¢/kWh.
Does LE-25 carry a demand charge?
Yes: $14.54/kW of monthly peak. For a reference 8-stall site at 150 kW per stall that comes to about $17,447 per month.
What does electricity cost per kWh dispensed on this tariff?
For the reference site — 8 Tesla V4 stalls dispensing 235 kWh per stall per day, with a 12% loss gross-up — the all-in utility cost works out to 38.3¢/kWh per dispensed kWh, rank 46 of 86 tariffs in the library (1 = least expensive).

Model a Tesla V4 Supercharger site on Entergy New Orleans LE-25 — payback, NPV, IRR, and a 15-year cash flow from your own inputs.

Run a scenario on this tariff

Other Louisiana utilities modeled: Entergy Louisiana, Entergy Louisiana.

All 86 modeled tariffs are on the utilities index.