ForgeAsset / Utilities / Evergy Kansas Metro
Evergy Kansas Metro BEVCS — EV fast-charging electricity cost
Evergy Kansas Metro BEVCS is the filed rate schedule ForgeAsset models for DC fast-charging sites in Evergy Kansas Metro territory in Kansas. Energy prices at 6.5¢/kWh–18.2¢/kWh by time of day; the demand side bills $3.24/kW of monthly peak. For one reference Supercharger site held constant across the whole library, that works out to 20.0¢/kWh per dispensed kWh — rank 10 of 86 filed tariffs (1 = least expensive).
Modeled rates
| Peak energy | 18.2¢/kWh |
| Off-peak energy | 10.5¢/kWh |
| Super-off-peak energy | 6.5¢/kWh |
| Demand | $3.24/kW of monthly peak |
| Rates effective | 2023-12-21 |
Evergy's Kansas City metro EV-charging schedule (Kansas side): time-of-use energy with no demand charge beyond a facility charge of about $3 per kW on the trailing twelve-month maximum — current-month-resolving for a steady billed peak. Rates fold the rider stack plus Johnson County sales tax; no Overland Park franchise fee is folded pending verification. Kansas City, Kansas is served by the BPU municipal utility, not this schedule.
Source: Evergy Kansas Metro filed rate schedule. Rates are digit-verified against the utility's own filed sheets and update within two weeks of any revision; derivations are on the methodology page.
What the reference site pays here
Reference site: 8 Tesla V4 stalls at 235 kWh/stall/day (57,183 kWh dispensed per month), a 150kW per-stall demand assumption, the model's default time-of-use mix, and a 12% loss gross-up — identical to the full utility ranking, where this tariff sits at position 10 of 86.
The rest of the Kansas picture
The tariff is one layer. State taxes, incentives, clean-fuels programs, and the charging market shape the remainder — Tesla Supercharger ROI in Kansas covers them, and the US Supercharger Economics Map shows every US Supercharger over utility territories colored by this same effective-cost derivation.
Evergy Kansas Metro BEVCS — questions
- What does Evergy Kansas Metro charge for energy on BEVCS?
- The modeled rates are 6.5¢/kWh–18.2¢/kWh by time of day. At the model's default time-of-use mix (30% peak, 45% off-peak, 25% super-off-peak) that blends to 11.8¢/kWh.
- Does BEVCS carry a demand charge?
- Yes: $3.24/kW of monthly peak. For a reference 8-stall site at 150 kW per stall that comes to about $3,884 per month.
- What does electricity cost per kWh dispensed on this tariff?
- For the reference site — 8 Tesla V4 stalls dispensing 235 kWh per stall per day, with a 12% loss gross-up — the all-in utility cost works out to 20.0¢/kWh per dispensed kWh, rank 10 of 86 tariffs in the library (1 = least expensive).
Model a Tesla V4 Supercharger site on Evergy Kansas Metro BEVCS — payback, NPV, IRR, and a 15-year cash flow from your own inputs.
Run a scenario on this tariffOther Kansas utilities modeled: Evergy Kansas Central.
All 86 modeled tariffs are on the utilities index.
ForgeAsset is software, not investment, tax, or legal advice — outputs are model estimates from your inputs, not guarantees. Rates current as of research; verify current terms with the utility's filed schedule before committing capital.