Georgia Power TOU-EVC-2 — EV fast-charging electricity cost

Georgia Power TOU-EVC-2 is the filed rate schedule ForgeAsset models for DC fast-charging sites in Georgia Power territory in Georgia. Energy prices at 9.8¢/kWh–15.7¢/kWh by time of day; the demand side bills $5.10/kW of monthly peak. For one reference Supercharger site held constant across the whole library, that works out to 23.6¢/kWh per dispensed kWh — rank 19 of 86 filed tariffs (1 = least expensive).

Model a site in Georgia

Modeled rates

Peak energy15.7¢/kWh
Off-peak energy9.8¢/kWh
Super-off-peak energy9.8¢/kWh
Demand$5.10/kW of monthly peak
Rates effective2026-06-01

Demand is billed per kW of the site's monthly peak (30-minute measurement). Energy rates bundle the filed base rates with the fuel, environmental, and DSM riders, month-weighted from the seasonal filed schedule. Georgia tax defaults apply on address resolve; Georgia's 2.8¢/kWh charging excise (from 2027) is not yet modeled.

Source: Georgia Power filed rate schedule. Rates are digit-verified against the utility's own filed sheets and update within two weeks of any revision; derivations are on the methodology page.

What the reference site pays here

Blended energy
11.6¢/kWh
Demand / month
$6,117
Bill / month
$13,517
Effective ¢/kWh
23.6¢/kWh

Reference site: 8 Tesla V4 stalls at 235 kWh/stall/day (57,183 kWh dispensed per month), a 150kW per-stall demand assumption, the model's default time-of-use mix, and a 12% loss gross-up — identical to the full utility ranking, where this tariff sits at position 19 of 86.

The rest of the Georgia picture

The tariff is one layer. State taxes, incentives, clean-fuels programs, and the charging market shape the remainder — Tesla Supercharger ROI in Georgia covers them, and the US Supercharger Economics Map shows every US Supercharger over utility territories colored by this same effective-cost derivation.

Georgia Power TOU-EVC-2 — questions

What does Georgia Power charge for energy on TOU-EVC-2?
The modeled rates are 9.8¢/kWh–15.7¢/kWh by time of day. At the model's default time-of-use mix (30% peak, 45% off-peak, 25% super-off-peak) that blends to 11.6¢/kWh.
Does TOU-EVC-2 carry a demand charge?
Yes: $5.10/kW of monthly peak. For a reference 8-stall site at 150 kW per stall that comes to about $6,117 per month.
What does electricity cost per kWh dispensed on this tariff?
For the reference site — 8 Tesla V4 stalls dispensing 235 kWh per stall per day, with a 12% loss gross-up — the all-in utility cost works out to 23.6¢/kWh per dispensed kWh, rank 19 of 86 tariffs in the library (1 = least expensive).

Model a Tesla V4 Supercharger site on Georgia Power TOU-EVC-2 — payback, NPV, IRR, and a 15-year cash flow from your own inputs.

Run a scenario on this tariff

All 86 modeled tariffs are on the utilities index.

ForgeAsset is software, not investment, tax, or legal advice — outputs are model estimates from your inputs, not guarantees. Rates current as of research; verify current terms with the utility's filed schedule before committing capital.