ForgeAsset / Utilities / Nashville Electric Service

Nashville Electric Service EVC — EV fast-charging electricity cost

Nashville Electric EVC is the filed rate schedule ForgeAsset models for DC fast-charging sites in Nashville Electric Service territory in Tennessee. Energy prices at 26.3¢/kWh flat; the demand side bills none (energy-only). For one reference Supercharger site held constant across the whole library, that works out to 29.4¢/kWh per dispensed kWh — rank 35 of 86 filed tariffs (1 = least expensive).

Model a site in Tennessee

Modeled rates

Peak energy26.3¢/kWh
Off-peak energy26.3¢/kWh
Super-off-peak energy26.3¢/kWh
Demandnone (energy-only)
Rates effective2026-07-01

TVA-standard EV-exclusive schedule: flat energy, no demand charge. The rate folds the trailing-twelve-month average of TVA's monthly fuel cost adjustment plus Tennessee's 7% sales tax. TVA base rates reset each October and the fuel adjustment moves monthly. Coverage is the Nashville Electric Service area.

Source: Nashville Electric Service filed rate schedule. Rates are digit-verified against the utility's own filed sheets and update within two weeks of any revision; derivations are on the methodology page.

What the reference site pays here

Blended energy
26.3¢/kWh
Demand / month
$0
Bill / month
$16,820
Effective ¢/kWh
29.4¢/kWh

Reference site: 8 Tesla V4 stalls at 235 kWh/stall/day (57,183 kWh dispensed per month), a 150kW per-stall demand assumption, the model's default time-of-use mix, and a 12% loss gross-up — identical to the full utility ranking, where this tariff sits at position 35 of 86.

The rest of the Tennessee picture

The tariff is one layer. State taxes, incentives, clean-fuels programs, and the charging market shape the remainder — Tesla Supercharger ROI in Tennessee covers them, and the US Supercharger Economics Map shows every US Supercharger over utility territories colored by this same effective-cost derivation.

Nashville Electric Service EVC — questions

What does Nashville Electric Service charge for energy on EVC?
The modeled rates are 26.3¢/kWh flat. At the model's default time-of-use mix (30% peak, 45% off-peak, 25% super-off-peak) that blends to 26.3¢/kWh.
Does EVC carry a demand charge?
No separable demand charge is billed under the modeled structure — the cost sits in the energy rates instead.
What does electricity cost per kWh dispensed on this tariff?
For the reference site — 8 Tesla V4 stalls dispensing 235 kWh per stall per day, with a 12% loss gross-up — the all-in utility cost works out to 29.4¢/kWh per dispensed kWh, rank 35 of 86 tariffs in the library (1 = least expensive).

Model a Tesla V4 Supercharger site on Nashville Electric Service EVC — payback, NPV, IRR, and a 15-year cash flow from your own inputs.

Run a scenario on this tariff

Other Tennessee utilities modeled: Memphis Light, Gas and Water (MLGW).

All 86 modeled tariffs are on the utilities index.

ForgeAsset is software, not investment, tax, or legal advice — outputs are model estimates from your inputs, not guarantees. Rates current as of research; verify current terms with the utility's filed schedule before committing capital.