Alabama Power BEVT — EV fast-charging electricity cost
Alabama Power BEVT is the filed rate schedule ForgeAsset models for DC fast-charging sites in Alabama Power territory in Alabama. Energy prices at 13.4¢/kWh–20.4¢/kWh by time of day; the demand side bills none (energy-only). For one reference Supercharger site held constant across the whole library, that works out to 19.0¢/kWh per dispensed kWh — rank 9 of 86 filed tariffs (1 = least expensive).
Modeled rates
| Peak energy | 20.4¢/kWh |
| Off-peak energy | 16.5¢/kWh |
| Super-off-peak energy | 13.4¢/kWh |
| Demand | none (energy-only) |
| Rates effective | 2026-01-01 |
Alabama Power's filed EV-charging rate: time-of-use energy with no demand charge — billing demand is metered only for a minimum bill that does not bind at multi-stall volumes. Rates fold the December-2024 RSE adjustment, the 2026 fuel factors, the state utility-license pass-through, and the 4% utility gross receipts tax. Every retail component is frozen through December 2027 by consent order. The schedule carries a five-year minimum contract term.
Source: Alabama Power filed rate schedule. Rates are digit-verified against the utility's own filed sheets and update within two weeks of any revision; derivations are on the methodology page.
What the reference site pays here
Reference site: 8 Tesla V4 stalls at 235 kWh/stall/day (57,183 kWh dispensed per month), a 150kW per-stall demand assumption, the model's default time-of-use mix, and a 12% loss gross-up — identical to the full utility ranking, where this tariff sits at position 9 of 86.
The rest of the Alabama picture
The tariff is one layer. State taxes, incentives, clean-fuels programs, and the charging market shape the remainder — Tesla Supercharger ROI in Alabama covers them, and the US Supercharger Economics Map shows every US Supercharger over utility territories colored by this same effective-cost derivation.
Alabama Power BEVT — questions
- What does Alabama Power charge for energy on BEVT?
- The modeled rates are 13.4¢/kWh–20.4¢/kWh by time of day. At the model's default time-of-use mix (30% peak, 45% off-peak, 25% super-off-peak) that blends to 16.9¢/kWh.
- Does BEVT carry a demand charge?
- No separable demand charge is billed under the modeled structure — the cost sits in the energy rates instead.
- What does electricity cost per kWh dispensed on this tariff?
- For the reference site — 8 Tesla V4 stalls dispensing 235 kWh per stall per day, with a 12% loss gross-up — the all-in utility cost works out to 19.0¢/kWh per dispensed kWh, rank 9 of 86 tariffs in the library (1 = least expensive).
Model a Tesla V4 Supercharger site on Alabama Power BEVT — payback, NPV, IRR, and a 15-year cash flow from your own inputs.
Run a scenario on this tariffOther Alabama utilities modeled: Huntsville Utilities.
All 86 modeled tariffs are on the utilities index.
ForgeAsset is software, not investment, tax, or legal advice — outputs are model estimates from your inputs, not guarantees. Rates current as of research; verify current terms with the utility's filed schedule before committing capital.