ForgeAsset / Utilities / San Diego Gas & Electric (SDG&E)
San Diego Gas & Electric (SDG&E) EV-HP — EV fast-charging electricity cost
SDG&E EV-HP is the filed rate schedule ForgeAsset models for DC fast-charging sites in San Diego Gas & Electric territory in California. Energy prices at 14.9¢/kWh–33.7¢/kWh by time of day; the demand side bills $126.89/mo per 25 kW block. For one reference Supercharger site held constant across the whole library, that works out to 34.5¢/kWh per dispensed kWh — rank 43 of 86 filed tariffs (1 = least expensive).
Modeled rates
| Peak energy | 33.7¢/kWh |
| Off-peak energy | 16.5¢/kWh |
| Super-off-peak energy | 14.9¢/kWh |
| Demand | $126.89/mo per 25 kW block |
| Rates effective | 2026-08-01 |
Demand subscription in 25 kW blocks (rate tier for sites above 150 kW). Energy rates are month-weighted from the seasonal filed table.
Source: San Diego Gas & Electric (SDG&E) filed rate schedule. Rates are digit-verified against the utility's own filed sheets and update within two weeks of any revision; derivations are on the methodology page.
What the reference site pays here
Reference site: 8 Tesla V4 stalls at 235 kWh/stall/day (57,183 kWh dispensed per month), a 150kW per-stall demand assumption, the model's default time-of-use mix, and a 12% loss gross-up — identical to the full utility ranking, where this tariff sits at position 43 of 86.
The rest of the California picture
The tariff is one layer. State taxes, incentives, clean-fuels programs, and the charging market shape the remainder — Tesla Supercharger ROI in California covers them, and the US Supercharger Economics Map shows every US Supercharger over utility territories colored by this same effective-cost derivation.
San Diego Gas & Electric (SDG&E) EV-HP — questions
- What does San Diego Gas & Electric (SDG&E) charge for energy on EV-HP?
- The modeled rates are 14.9¢/kWh–33.7¢/kWh by time of day. At the model's default time-of-use mix (30% peak, 45% off-peak, 25% super-off-peak) that blends to 21.3¢/kWh.
- Does EV-HP carry a demand charge?
- Yes: $126.89/mo per 25 kW block. For a reference 8-stall site at 150 kW per stall that comes to about $6,091 per month.
- What does electricity cost per kWh dispensed on this tariff?
- For the reference site — 8 Tesla V4 stalls dispensing 235 kWh per stall per day, with a 12% loss gross-up — the all-in utility cost works out to 34.5¢/kWh per dispensed kWh, rank 43 of 86 tariffs in the library (1 = least expensive).
Model a Tesla V4 Supercharger site on San Diego Gas & Electric (SDG&E) EV-HP — payback, NPV, IRR, and a 15-year cash flow from your own inputs.
Run a scenario on this tariffOther California utilities modeled: Pacific Gas & Electric (PG&E), Southern California Edison (SCE).
All 86 modeled tariffs are on the utilities index.
ForgeAsset is software, not investment, tax, or legal advice — outputs are model estimates from your inputs, not guarantees. Rates current as of research; verify current terms with the utility's filed schedule before committing capital.